01 · Request a pilot
Tell us about the line – we'll come back within 48 hours.
SensoryOps wires into existing PLC stacks via OPC-UA or MQTT. A typical pilot is a 4-week integration on one production line, followed by a 90-day validation period against your historical batch logs.
02 · What a pilot looks like
Week 1
Vessel survey
On-site capture of vessel geometry, PLC schematic, and three months of historical batch logs.
Week 2 – 3
PINN training
We train the physics-informed model on your line. You see the live training-loss curve in the dashboard.
Week 4
Wire-in + dry run
Read-only OPC-UA connection. The model predicts every batch in parallel; no setpoints push to the PLC yet.